Contract for longest US cable-stayed bridge

Flatiron Structures [a subsidiary of HBG Constructors] has acquired a joint venture design and build contract for a cable-stayed bridge over Cooper River between Charleston and Mount Pleasant, South Carolina. When completed in 2005, the bridge will be the longest cable-stayed bridge in North America. The contract value amounts to US$531 million, of which 40% is for HBG.